Translate

CO.Advanced_Miner_Upgrades.01.Paragraph
Further improvements to the ore extractor and smelter are now available. In addition we have finally perfected the Quarry system. Use the Geological Surveyor to identify a prime location then place the quarry to begin mining operations.

String is usually marked as needing editing after source string change or this can be done manually.

SourceTranslationState
4
Advanced Logistics
高級物流
5
Advanced Logistics
高級物流
6
We now have a new mass storage system and a sorting mechanism for moving ore between conveyor belts.
我們現在有一個新的大容量存儲系統和一個分選機構,用於在輸送帶之間移動礦石。
7
Advanced Miner Upgrades
高級礦工升級
8
Advanced Miner Upgrades
高級礦工升級
9
Further improvements to the ore extractor and smelter are now available. In addition we have finally perfected the Quarry system. Use the Geological Surveyor to identify a prime location then place the quarry to begin mining operations.
現在可以對礦石提取器和冶煉廠進行進一步的改進。此外,我們終於完善了採石場系統。使用地質測量師確定一個黃金地段,然後放置採石場開始採礦作業。
10
Advanced Power Grid
高級電網
11
Advanced Power Grid
高級電網
12
We have made further improvements to our power infrastructure including a new Power Storage Block and Laser Energy Transmitter.
我們對電力基礎設施進行了進一步改進,包括新的電源存儲塊和激光能量發射器。
13
We also have some provisional designs for a new type of Power Generator, however to complete this research we will also need to find a denser source of energy than the coal we have been relying on so far.
我們還對一種新型發電機進行了一些臨時設計,但是為了完成這項研究,我們還需要找到比目前為止依賴的煤更濃密的能源。
14
Advanced Research
高級研究

Loading…

Loading…

Glossary

Source Translation
No related strings were found in the glossary.

Source information

Context
CO.Advanced_Miner_Upgrades.01.Paragraph
Flags
ignore-begin-space, ignore-end-newline, ignore-begin-newline, ignore-end-space
Source string age
8 years ago
Translation file
res/values-zh/handbook-CompletedResearch.xml, translation unit 9
String priority
Medium