Editing source string

MA.Garbage_Thief.01.Paragraph

String is usually marked as needing editing after source string change or this can be done manually.

SourceTranslationState
427
Improves the speed at which an ore extractor mines ore at the cost of increased power usage.
Improves the speed at which an ore extractor mines ore at the cost of increased power usage.
428
Specifications
Specifications
429
Extraction Speed:
Extraction Speed:
430
1600%
1600%
431
Cyberdyne Garbage Thief (tm)
Cyberdyne Garbage Thief (tm)
432
The Cyberdyne Garbage Thief (or Rubbish Thief as some call it) is simply and Ore Thief with reconfigured to remove garbage in the inventory instead of ore. This machine when used in conjunction with multiple Construction Paste Grinders can rapidly remove and process garbage into construction paste freeing up inventory in the process. For optimal performance replace the floor of a frequented hallway with this machine and an appropriate output handling system.

Simply build our brand-new Garbage Thief (tm) in a 3x3 layout and supply with a mere 5 power per Block, then just stand on it and let IT do the hard work for you!
The Cyberdyne Garbage Thief (or Rubbish Thief as some call it) is simply and Ore Thief with reconfigured to remove garbage in the inventory instead of ore. This machine when used in conjunction with multiple Construction Paste Grinders can rapidly remove and process garbage into construction paste freeing up inventory in the process. For optimal performance replace the floor of a frequented hallway with this machine and an appropriate output handling system.

Simply build our brand-new Garbage Thief (tm) in a 3x3 layout and supply with a mere 5 power per Block, then just stand on it and let IT do the hard work for you!
433
Specifications
Specifications
434
Garbage Collection Speed:
Internal Storage:
Power Usage:
Garbage Collection Speed:
Internal Storage:
Power Usage:
435
Upto 3,300/minute!
100 units of Garbage!
Only 5 power per Garbage!
Upto 3,300/minute!
100 units of Garbage!
Only 5 power per Garbage!
436
Gas Bottler
Gas Bottler
437
The Gas Bottler is the final step in the particle refining process, utilizing the stored particles from a single Particle storage it is able to output said particles into single use containers. The Gas Bottler is built in a 3x3x9 formation.
The Gas Bottler is the final step in the particle refining process, utilizing the stored particles from a single Particle storage it is able to output said particles into single use containers. The Gas Bottler is built in a 3x3x9 formation.

Loading…

Loading…

Glossary

Source Translation
No related strings were found in the glossary.

Source information

Context
MA.Garbage_Thief.01.Paragraph
Flags
ignore-begin-space, ignore-end-newline, ignore-begin-newline, ignore-end-space
Source string age
8 years ago
Translation file
res/values/handbook-Materials.xml, translation unit 432
String priority
Medium